House Wiring Location - GE CV966 Owner's Manual And Installation Instructions

Range hoods
Table of Contents

Advertisement

DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS
• Keep the wood support piece and its screws for later
installation. Do not discard.
• Measure desired distance from the bottom of the hood to
the previous page if the accessory duct cover will be used.
• Use a level to draw a horizontal line indicating the bottom
of the hood.
• Use a level to draw the cooktop centerline location.
• Measure 15-3/8" up from the horizontal line for the
bottom of the hood. Draw another horizontal line.
• Measure 18" up from the line for the bottom of the hood,
draw another horizontal line to indicate the top of the hood.
FOR VERTICAL (Straight Up) DUCTING:
the ceiling.
- Measure 6-7/8" from drywall to mark centerline for a
7-1/2" diameter duct hole on the ceiling.
- If drywall is not present, add drywall thickness to the
6-7/8" dimension.
Venting through a soffit or upper cabinet:
• Follow the same procedure for ceiling ducting to cut the
7-1/2" dia. hole through the top of the cabinet or soffit.
• See Step 4, page 15 for details to cut opening for duct
transition.

House Wiring Location:

on the right side. See illustrations for hood knockout
locations.
Note:
the hood.
the top of the hood at the right side.
To route house wiring through the ceiling or soffit:
the ceiling; 11-1/8" to the right of the centerline for 30"
models or 14-1/8" to the right of the centerline for 36"
models.
To route house wiring through the wall:
top of the hood, 11-1/8" to the right of the centerline for
30" models or 14-1/8" to the right of the centerline for 36"
models..
• Remove top or rear knockout depending on your
installation.
• Install strain relief onto back or top of hood.
49-80520-7
Installation Instructions
6-7/8"
Centerline to Wall
7-1/2" Dia.
Hole
FOR WALL VENT DUCT
Top of Hood
18"
Bottom of Hood
FOR DUCTING THROUGH REAR WALL:
• Measure the supplied duct transition with any straight
run length of duct used, plus 90" elbow height. Draw a
horizontal line on the wall intersecting the centerline.
Knockout
Locations
10-1/16"
FOR CEILING
VENT DUCTING
Electrical
Centerline 8" Min.
above Top of
Hood
Wood
Support
15-3/8"
Electrical
14-1/8" for 36" Models
11-1/8" for 30" Models
5-7/8"
14-1/8" for 36" Models
11-1/8" for 30" Models
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cv936Jv966Jv936

Table of Contents