Download Print this page

Hitachi 505 Operation Manual page 97

Advertisement

i l '
F
f-I
l-l
5
I
I
1
\
-t
-l
-l
-l
:l
:l
Ir
:l
1r
t
Set-Up Procedure
(")
tr'ind the cornbination of R and C from the Table 2.10-1.
(f)
?atch the above value on the Pre-Patch ?anel,
The set value of R is the value which has not been
shorbed by the patchcords.
An illustration
is shovm
in Figure 2.LO-2.
(")
Ascertain
t,he function
applying the jnput and watching
the input and output on the oseilloseope
if
possible "
This will
reduce the difficulty
in the analysis
due to
errors
in patching or inadequate RC selection.
In the patching of the capaci-tor, the circled
terminal
in
RI or RO area in the Pre-?atch Panel- Should be connected tu the
circl-ed te:minal
in one of the capacitor
area.
- 9 1 -

Advertisement

loading