Circuit breaker cover

Advertisement

Available languages

Available languages

Quick Links

g
WARNING: Danger of electrical shock or injury.
Turn OFF power ahead of the panelboard or
switchboard
equipment or removing any component
not remove or install circuit protective devices
or any other component until the power is
turned OFF.
General
These instructions apply to type FB circuit breaker frames.
Installation
1. Select the breaker cover. The part numbers of the
appropriate covers for various switchboards and
panelboards are listed in Table 1.
Switchboard or Panelboard Width
27 & 31"
Pnlbd
Cover Height
35" Swbd
4
/
" (3X)
10095004P1
1
8
5
/
" (4X)
1
2
2 ¾"(2X)
10095004P8
4
/
" (3X)
1
8
Table 1. Part numbers of FB circuit breaker covers for various
panelboard and switchboard sizes.
2. Attach the gas barrier and center barrier to the
breaker cover with the two push-in rivets provided, as
illustrated in Figure 1.
3. Attach a space filler (part number 10085624P1) to
the cover if there is no breaker installed behind one
of the holes. Secure the filler with the two #10 x
screws provided, tightened to 27–32 in-lb, as shown in
Figure 2. If a single 1 pole breaker is across from 2
pole or two 1 pole or 2 pole across from 3 pole
breaker, install single pole space filler (part number
10095241P1) into cover where no breaker is installed,
as shown in Figure ??.
4. Install the assembled breaker cover on the cover
collector frame using 2 thread-forming screws, as
shown in Figure 4. Tighten the thread-forming
screws to 15–20 in-lb. If mounting into existing
panelboard/switchboard using flexible supports,
install by placing square holes over flexible support
clips and press until seated, as shown in Figure 3.
before
working
inside
36 & 40"
Pnlbd
44" Pnlbd
40" Swbd
45" Swbd
10095004P2
10095004P3
10095004P4
10095004P5
10095004P6
10095004P7
10095004P9
10095004P10
DEH41125 Installation Instructions
Spectra Series™ Power Panelboards
Circuit Breaker Cover
Catalog Numbers AFP2FBD, AFP3FBD, AFP3FBDS, AFP4FBD
the
.
Do
Gas &
Center
Barrier
Figure 1. Attaching the gas and center barrier to the
breaker cover.
#10 Screws
3
/
"
8
Figure 2. Space filler installed on a breaker cover.
Figure 3. Breaker cover installed on the supports on the breaker
Rivets
Cover
Space
Filler
Cover
Supports
module.
R01

Advertisement

loading

Summary of Contents for GE Spectra Series AFP2FBD

  • Page 1 DEH41125 Installation Instructions Spectra Series™ Power Panelboards Circuit Breaker Cover Catalog Numbers AFP2FBD, AFP3FBD, AFP3FBDS, AFP4FBD WARNING: Danger of electrical shock or injury. Turn OFF power ahead of the panelboard or switchboard before working inside equipment or removing any component not remove or install circuit protective devices or any other component until the power is turned OFF.
  • Page 2 Should further information be desired or should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the GE Company. GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062 DEH41125 R01 0705 ©...
  • Page 3 DEH41125 Instructions d’installation Panneaux de distribution Spectra Series™ Couvercle de disjoncteur Numéros de catalogues AFP2FBD, AFP3FBD, AFP3FBDS, AFP4FBS 5. Pour fixer dans un tableau de contrôle ou dans un AVERTISSEMENT: Danger de choc électrique panneau de distribution existants avec les supports ou de blessure.
  • Page 4 Si des informations supplémentaires étaient requises ou s’il survenait un problème particulier lesquels ne sont pas suffisamment couverts selon l’acheteur, ceci devrait être référé à GE Company. GE Industrial Systems General Electric Company 41 Woodford Ave., Plainville, CT 06062...

This manual is also suitable for:

Spectra series afp3fbdSpectra series afp3fbdsSpectra series afp4fbd